Upgrade and Further Development of SAUNA Field Report 1: Definition of operational and technical requirements of the upgraded SAUNA-Field
Publish date: 2018-01-29
Report number: FOI-R--4561--SE
Pages: 16
Written in: English
Keywords:
- Radioxenon
- SAUNA Field
- OSI
- noble gas
Abstract
This report defines the operation and technical requirement for the upgrade of the SAUNA Field system. Requirements are formulated based upon experience from workshops and IFE14. The findings include the final requirements and the recommendations for upgrades to the SAUNA Field system. This work is described in detail in CTBTO contract number 2017-1505 (FOI 2017-1283).